KIM Expressway, Gujarat

Project description –

National Highways Development Project (NHDP) Phase-VI is for development of 1000 km of expressways and includes construction of about 379 km long Vadodara-Mumbai Expressway proposed to be implemented under Public Private Partnership mode and to be executed as Design, Build, Finance and Operate (DBFO) contracts. The proposed Main Expressway passes through the states of Maharashtra, Union territory of Dadra & Nagar Haveli and Gujarat. The total length of the proposed expressway is about 379 km and runs generally parallel to the existing NH-8.

The Project Expressway Package III of the Expressway traverses through Bharuch districts viz. starts from Manubar Km 292+000 and ends at Sanpa Km 323.00 near Karjan City in the state of Gujarat.

DECG Scope –

DECG International supplied a large number of bearings and expansion joints.

Key Data –

 

Products:

POT bearings and Strip Seal Expansion Joints

Installed:

2019

City:

Vadodara

DECG InternationalKIM Expressway, Gujarat